Analysis Summary: UK – Sapphire Utilities Solutions Contracts
View Tenders Refine Filters:Publication summary
Found 8 procurement notices in 2025. There are 6 unique titles.
The following chart shows the number of matched notices per month:
Buyer organisations
Supplier organisations
Top 16 suppliers
Buyer locations
Locations of the main buyers:
Keywords Sample
Below are common keywords found in published notices. Keywords derive from allocated CPV codes.
- gully cleaning
- construction work
- gully cleaning and emptying
- weir construction
- building demolition
- sludge treatment
- storm water piping
- wastewater plant
- wastewater pumping station
- wastewater treatment plant
- water distribution
- water distribution pipelines
- water main refurbishment
- water treatment work
- ancillary works
- dam construction
- dam reinforcement works
- dam wall
- dredging and pumping
- drinking water treatment plant
- dyke construction
- foul water piping
- general construction
- pipelaying construction
- pipeline lifting and relaying
- pipeline relaying
- pipe system
- pumping station
- reservoir construction
- river regulation and flood control
- sewage outfall
- sewage pumping stations
Common phrases
Common phrases found within published text:
- reactive gully cleansing
- lancashire
- reactive
- awarding framework agreements
- lancashire none
- only delivery runway
- our amp8 operating model
- max duration
- amp8
- free flow
- portway strategic corridor - phase 1 - drainage maintenance none
- water
- bcis general civil engineering cost index
- minor works
- drainage investigation
- maintenance and repair term contract
- gr/hgw/a4 portway strategic corridor - phase 1 - drainage maintenance
- max
- gceci
- construction
Similar searches
Searches that sound similar to your query: