Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Bulkhead
A Contract Award Notice
by BMB JOINT VENTURE (BAM NUTTALL, MORGAN SINDALL PLC & BALFOUR BEATTY)
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 1 month
- Value
- £1
- Sector
- CONSTRUCTION
- Published
- 08 Jan 2021
- Delivery
- 08 Nov 2020 to 09 Dec 2020
- Deadline
- 30 Oct 2020 12:00
Concepts
Location
1 buyer
1 supplier
- Unnamed None
Description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Section 4: Scope of Works Hammersmith site has requirement for a Connection Culvert Bulkhead detailed in the drawings provided with this advert. The Bulkhead shall be supplied with all the fixings required for BMB to assemble the bulkhead in the Hammersmith Connection Culvert. No construction or manufacture should commence until BMB have confirmed approval of drawings. Approved for construction drawings will be issued as soon as they become available. All deliveries are to be in accordance with the delivery requirements (FORS). Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams. Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point. Provision of accurate product specifications to accompany the quotation.
Award Detail
1 | Unnamed (None)
|
CPV Codes
- 45262670 - Metalworking
Other Information
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest. Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail. BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) BMB-JV Tideway West, Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=51829...
Reference
- C4A51829433
- CF bbef77cc-0b69-4b4e-9383-633d34084dd4