Wheel Slip Prevention Fitment Part 2 — Class 150/0 and 150/1 WSP Installation

A Utilities Contract Award Notice
by NORTHERN TRAINS LTD

Source
OJEU
Type
Contract (Services)
Duration
16.5 month (est.)
Value
___
Sector
TRANSPORT
Published
01 Feb 2021
Delivery
08 Mar 2021 to 22 Jul 2022 (est.)
Deadline
n/a

Concepts

Location

Newton Heath Train Maintenance Depot, Dean Ln, Manchester M40 3AD

Geochart for 2 buyers and 1 suppliers

2 buyers

1 supplier

Description

Northern Trains Ltd (NTL) have selected a supplier to provide installation of an improved Wheel Slide Protection (WSP) system, that will mimic an anti-locking braking system, in order to improve wheelset lifecycle and operating performance. NTL have appointed a supplier to retro-fit 6 BR class 150/0 rail vehicles and 100 BR class 150/1 rail vehicles with a wheel slide protection (WSP) system.

Total Quantity or Scope

NTL have selected a rail engineering supplier who can evidence a proven track record of having performed complex safety critical modifications to British Rail class 15x rail vehicles to quality, timescale and budget, with experience of providing pre-work surveys and design. The chosen supplier has employees/contractors assessed to recognized standards of safety and quality and with processes in place to ensure and demonstrate compliance to these standards, and be cost effective, providing fair, clear, transparent and firm pricing for the entire project. NTL envisage that the duration of the contract will be for the period to delivery of the works. Based on NTL’s preferred fitment rate, NTL expects the term of the contract to be approximately 16 months.

Award Detail

1 Unnamed (None)
  • Wheel Slip Prevention Fitment Part 2 — Class 150/0 and 150/1 WSP Installation

CPV Codes

  • 50221000 - Repair and maintenance services of locomotives

Indicators

  • Award on basis of price and quality.

Reference

Domains