CHARM - Timber Frame Erection and Carpentry
A Tender Notice
by ACCORD HOUSING ASSOCIATION LTD
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 9 month
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 17 Mar 2021
- Delivery
- To 30 Dec 2021 (est.)
- Deadline
- 01 Apr 2021 11:00
Concepts
Location
Edward Street, Redditch, B97 6HA
2 buyers
- Accord Housing Association West Bromwich
Description
This is a subcontracts package to carry out both the Timber Frame Erection and Carpentry for the CHARM virtually plastic free homes in Redditch, Worcestershire. The main tender information is in the Invitation to Tender document (supplied in PDF and Word versions below).
Total Quantity or Scope
The Apartment block is 3 storeys, with 12 Apartments: • Timber Frame Erection - Eco 200 panels • First Fix • Second Fix • Final Fix • Soft Pine Skirting and Architrave • Fire stopping (incl for PODs) • Fitting fire socks • Double Battens • Window former • Spandrel panels • Kit Erect/cranes - lifting plans required • Acoustic Floor • Internal doors to be door kits, Communal to be pre-hung door sets and Apartment doors to be SBD timber door sets • Joists • Main Roof • VCL • Sure deck • Stairs • All carpentry works including ironmongery fix • Ballustrade (Possibly steel) • Canopies • Vertical Cladding - The cladding will be secret fixed through the tongue with stainless steel nails and cut ends of the cladding are to be treated with fire preservative supplied by the timber merchant • Final Snagging • Cavity Barriers • Fire Protection • Cranes (include for POD's) • Cutting out holes (incl for POD's) • Supply Fixings • Snag • 12 Months defects • Fixed price duration of project • Customer Care to comply with Accord's Service Level Agreement
CPV Codes
- 45000000 - Construction work
Indicators
- Bids should cover the whole contract.
- Renewals are not available.
- Award on basis of price and quality.
Legal Justification
This procurement procedure is an accelerated open procedure as there is urgency in publicity of this tender. This is because we first initially failed to publish this on Contracts Finder as well. Therefore, we had to re-tender this work package and if we were to go through the standard procedure, it will lead to loss of finance due to interest cost on the site and on costs associated with the building site set up. In addition to the grant programme has a number of grant milestones that the additional delay would put at a risk the spending of the EU public funding.