Butterburn Bridge: Gabion wall repair
A Contract Award Notice
by CUMBRIA COUNTY COUNCIL
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 7 month
- Value
- £28K
- Sector
- CONSTRUCTION
- Published
- 25 Mar 2021
- Delivery
- 29 Mar 2021 to 30 Oct 2021
- Deadline
- 01 Mar 2021 12:00
Concepts
Location
1 buyer
- Cumbria County Council Carlisle
1 supplier
- Metcalfe Plant Hire Penrith
Description
Butterburn bridge carries the U1241 road over the Butter Burn (not a main river). The bridge lies approximately 10km to the east of the village of Bewcastle. It is a single span structure comprising of rolled steel joints encased in concrete. Works to this asset were undertaken in 2018. Details of which can be reviewed in the attached Completion Report, titled 'MET-1232-CA184-ST-REP-00001_iss1_rev0'. The bridge requires repair of the gabion baskets which are reported to have collapsed and washed out. Therefore, these require replacement, remove stone from both layers of existing gabion baskets, place new gabion baskets on same foundation and refil using reclaimed stone from existing baskets. Back fill voids behind new baskets with no fines concrete.
Award Detail
1 | Metcalfe Plant Hire (Penrith)
|
CPV Codes
- 45000000 - Construction work
Indicators
- Contract is suitable for SMEs.