Kingston Maurward College Low Carbon Heating Project

A Tender Notice
by REENERGISE PROJECTS LIMITED

Source
Contracts Finder
Type
Contract (Works)
Duration
5.5 month
Value
£200K-£2M
Sector
CONSTRUCTION
Published
02 Jul 2021
Delivery
11 Oct 2021 to 31 Mar 2022
Deadline
02 Aug 2021 17:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The purpose of this pre-qualification is to provide you with detail about the project, so that you can advise us which aspects of the project you wish to bid for; and if any of these are of interest, to seek responses to the pre-qualification questionnaire. From these responses we will be selecting a shortlist of Contractors to issue an Invitation to Tender. The project will install 2 district heat networks at Kingston Maurward College, Dorchester, which will use ground source heat pumps to replace the existing oil and LPG boilers as the source of heating and hot water. The College has obtained a Government Public Sector Decarbonisation Scheme grant which requires that the project must be completed by 31st March 2022. Interested parties are requested to respond to contracts@reenergisegroup.com by Friday 9th July 2021, indicating whether you will be submitting a full PQQ response. If you wish to submit the full response, please email the completed Appendix A (expression of interest) and Appendix B (PQQ) of the attached pre-qualification document to contracts@reenergisegroup.com by Monday 2nd August 2021. Project Overview The project is split into 2 districts and a ground array as follows: 1. Main District: High temperature GSHPs with a total capacity of approximately 400kW will be required. These are to be located in a new prefabricated plant room, which will be sited on a slope and require a raised foundation slab. A new heat main (approx. length 500m) will connect the system to 13 existing heating systems (via heat exchangers) serving 19 buildings. The new district heating system will also provide heat to a Visitors Centre, which is currently heated with electric heaters. As well as the plant room foundation, builders work will be required to clear structures and create an access road to the plant room. Electrical power to the new plant room will be provided under a separate contract. All existing oil / LPG plant will need to be removed from the plant rooms. 2. Glasshouses District: High temperature GSHPs with an approximate capacity of 224kW are to be located in an existing plant room. A new heat main (approx. length 100m) will connect the system to provide heat to 5 glasshouses already supplied from the plant room, plus the nearby Gardener's Cottage, currently heated by a wood burner. Builders work may be required to create plinths for the new plant; plus a foundation slab for the thermal store, which will be located outside the plant room. Existing oil plant will need to be removed from the plant room serving the glasshouses. 3. Ground Array: Both districts will be supplied from a single large ground array of approximately 120,000m2, to be installed in nearby fields within the College grounds. The flow and return pipes will require a road crossing.Timetable The following is an outline of the intended timetable. These are latest dates and will be accelerated if possible:

CPV Codes

  • 45222000 - Construction work for engineering works except bridges, tunnels, shafts and subways
  • 45232140 - District-heating mains construction work

Indicators

  • Contract is suitable for SMEs.

Other Information

Pre-qualification document RePP 21-987 KMC Pre-qualification Document 2 July 2021.pdf