Air velocity measurement equipment

A Tender Notice
by UNIVERSITY OF SALFORD(THE)

Source
Contracts Finder
Type
Contract (Products)
Duration
1 year
Value
£5K-£8K
Sector
INDUSTRIAL
Published
12 Jul 2021
Delivery
01 Aug 2021 to 31 Jul 2022
Deadline
26 Jul 2021 12:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Energy House 2 (EH2) is a large-scale building physics test laboratory to be built at the University of Salford, Manchester. The project Is part funded by the ERDF. The construction will begin in summer 2020 with the construction period set to last 12 months. The project builds on the successful Energy House project :(https://www.salford.ac.uk/built-environment/laboratories-and-studios/energy-house ). A video of the project can be found here https://www.youtube.com/watch?v=oP3bsXeQKYU EH2 will be a unique facility and one of most advanced building test facilities on the planet. It has the following features: • 2 large chambers capable of having 2 family homes built in each one (4 homes in total) • Temperature controlled to within 0.5 °C from -20°C to +40 °C • Wind, rain, solar radiation and snow can be generated • These conditions provide testing facilities for housing covering 95% of the global population. The Energy House 2 Project has a requirement to measure air velocity in a chamber environment. This will range from air movement provided by wind machines through to light air movement from the HVAC units providing cooling and heating to the chamber. Another requirement will be to use air flow inside buildings to inform thermal comfort calculations.

CPV Codes

  • 35125100 - Sensors

Indicators

  • Contract is suitable for SMEs.

Other Information

For full tender documentation please go to our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home Please send all correspondence to our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home

Reference

Domains