CBC-1246-FC-CE Derwent Lower School Construction

A Tender Notice
by CENTRAL BEDFORDSHIRE COUNCIL

Source
Find a Tender
Type
Contract (Works)
Duration
22.5 month
Value
£0-£6M
Sector
CONSTRUCTION
Published
16 Aug 2021
Delivery
01 Nov 2021 to 13 Sep 2023
Deadline
20 Sep 2021 11:00

Concepts

Location

Central Bedfordshire: Derwent Lower School, Hitchin Road, Henlow SG16 6BA

Geochart for 1 buyers and 0 suppliers

Description

New build two storey KS2 block with 8nr classbases, including ancillary spaces such as SEND, Studio, Food/Science/DT and offices; a 2nr reception classbase extension, an extension to the library into the courtyard, an extension to the existing hall; extensive remodelling and refurbishment to the existing school block and associated external works.Section 1: Construction of a new two storey stand-alone Teaching Block and the Reception Classroom extension (2nr) and associated external works (excluding the car park).Section 2: Construction of the separate Dining Store and Library extensions to the existing school block and the refurbishment of the existing school block and associated external works + the formation of the car park.Planned date of commencement: 28th October 2021 (section 1), 1st July 2022 (section 2)Anticipated construction period: 45 weeks and 1 day Completion date: 9th September 2022

Total Quantity or Scope

New build two storey KS2 block with 8nr classbases, including ancillary spaces such as SEND, Studio, Food/Science/DT and offices; a 2nr reception classbase extension, an extension to the library into the courtyard, an extension to the existing hall; extensive remodelling and refurbishment to the existing school block and associated external works.Section 1: Construction of a new two storey stand-alone Teaching Block + the Reception Classroom extension (2nr) + associated external works (excluding the car park).Section 2: Construction of the separate Dining Store and Library extensions to the existing school block + the refurbishment of the existing school block + associated external works + the formation of the car park.Target contract commencement: Start on Site:• Section 1 1st November 2021• Section 2 5th July 2022Note: - There will be a decant period between the completion of Section 1 and the commencement of Section 2 (between 28th June 2022 and 4th July 2022). Contractor to remain on site for this duration and relocate the site set-up as indicated on the Tender drawings.Target contract delivery dates:• Section 1 • 27th June 2022• Section 2 • 13th September 2022End of Defects Liability / Rectification Period:• Section 1 27th June 2023 (12 months)• Section 2 13th September 2023 (12 months)

CPV Codes

  • 45214200 - Construction work for school buildings

Indicators

  • This is a one-off contract (no recurrence)
  • Renewals are not available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains