River Aire Re-meander feasibility study

A Contract Award Notice
by DEFRA NETWORK ETENDERING PORTAL

Source
Contracts Finder
Type
Contract (Works)
Duration
4 month
Value
£43K-£50K
Sector
CONSTRUCTION
Published
26 Aug 2021
Delivery
30 Nov 2020 to 02 Apr 2021
Deadline
15 May 2020 17:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

As part of the Leeds FAS 2 this project will develop a catchment wide approach to reducing flood risk to Leeds. This includes natural flood management (NFM) measures on the upper and mid stretches of the River Aire as an integral part of Phase 2 of the scheme, complementing engineered flood defences in Leeds.

Award Detail

1 Stantec (None)
  • Value: £42,572

CPV Codes

  • 45246000 - River regulation and flood control works

Indicators

  • Contract is suitable for SMEs.
  • Contract is suitable for VCOs.

Other Information

Ecological Services Framework 3 2018/S 228-521850 n/a R Aire Re-Meander Feasibility _ fully signed contract_Redacted.pdf

Reference

Domains