The Supply of Half-Hourly and Non Half Hourly Metered Electricity and Mains Metered Natural Gas Sites Throughout the UK

A Addendum Notice
by WEST MIDLANDS TRAINS LIMITED

Source
Find a Tender
Type
Contract (Goods)
Duration
not specified
Value
___
Sector
INDUSTRIAL
Published
20 Sep 2021
Delivery
not specified
Deadline
n/a

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The Supply of Half-Hourly and Non Half Hourly Metered Electricity and Mains Metered Natural Gas Sites Throughout the UK.

Ammendments to Previous Notice

2. II.2.4

Supply of half hourly metered electricity to sites throughout the West Midlands Railway Network with an estimated annual consumption of 14.0 GWh PA for either a twelve or twenty four month period commencing 10/12/2021. This Lot consists of 74 metered supply points. This lot may be awarded individually or may be combined with Lots 2 and/or 3. Further details are contained within the tender documents.

3. II.2.4

Supply of non half hourly metered electricity to sites throughout the West Midlands Railway Network with an estimated annual consumption of 2.8 GWh PA for either a twelve or twenty four month period commencing 10/12/2021. This Lot consists of 91 metered supply points. This lot may be awarded individually or may be combined with Lots 1 and/or 3. Further details are contained within the tender documents.

4. II.2.4

Supply of mains metered natural gas to sites throughout the West Midlands Railway Network with an estimated annual consumption of 9.6 GWh PA for either a twelve or twenty four month period commencing 10/12/2021. This Lot consists of 25 metered supply points. This lot may be awarded individually or may be combined with Lots 1 and/or 2. Further details are contained within the tender documents.

CPV Codes

  • 09000000 - Petroleum products, fuel, electricity and other sources of energy

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains