HS2 Euston Station - Site Wide Temporary Utiliies and MEP Package

A Contract Award Notice
by MACE DRAGADOS

Source
Contracts Finder
Type
Contract (Works)
Duration
32 month
Value
£1M-£2M
Sector
INDUSTRIAL
Published
05 Oct 2021
Delivery
30 Apr 2021 to 02 Jan 2024
Deadline
05 Jan 2021 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

Mace Dragados are seeking expressions of interest from Subcontractors to undertake the Site Wide Temporary Utilities and MEP Package. The scope of the package consists of but is not limited to the following services/works: - Provide utility tie-ins to existing services - Installation and Maintenance of site and hoarding lighting - Installation, maintenance and subsequent removal of all temporary utilities including plumbing, electrical services etc - Undertake relocation of electrical services on an adhoc basis - Installation, maintenance and relocation of small power and accessories as required - Connections of electrical services up to all site accommodation - Ensuring safe systems of work are adhered to in all instances - Management of Electrical assets such as distribution boards, site transformers, lighting, heating and fire alarms etc - All aspects of generator connections and earthing for provision of temporary power - Undertake PAT Testing as required Works shall be contracted under NEC3 Engineering Construction Subcontract terms and conditions (with project specific amendments)

Award Detail

1 Wingate Electrical (Basingstoke)

CPV Codes

  • 31681000 - Electrical accessories
  • 71334000 - Mechanical and electrical engineering services
  • 45317300 - Electrical installation work of electrical distribution apparatus
  • 31680000 - Electrical supplies and accessories
  • 45332200 - Water plumbing work

Other Information

Suppliers must have extensive demonstrable experience of delivering similar complex packages on previous projects of a similar scale on large major infrastructure projects. This experience must be applicable and relevant to the respective lots listed. If successful selected suppliers will be required to go through Mace Dragados pre-qualification process to be included on the final tender list. Mace Dragados have been appointed as the Construction Partner to build a fully-integrated HS2 station at London Euston, together with links to the existing London Underground station. HS2 Phase One includes construction of a new railway line run from London Euston to new stations at Old Oak Common in West London, an Interchange Station near Birmingham Airport and the National Exhibition Centre (NEC) and a terminus station in Birmingham City Centre (Curzon Street). Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=52650...

Reference

Domains