3626236 DAERA – AFBI – LiDAR DIGITAL TOPOGRAPHIC SCAN OF NORTHERN IRELAND
A Addendum Notice
by AGRI-FOOD AND BIOSCIENCES INSTITUTE
- Source
- Find a Tender
- Type
- Contract (Services)
- Duration
- not specified
- Value
- ___
- Sector
- ENVIRONMENT
- Published
- 07 Oct 2021
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
1 buyer
Description
The appointed Contractor will be responsible for acquiring, processing and delivering a LiDAR scan of the land area of Northern Ireland. The LiDAR data set must cover the entire land area of Northern Ireland and be provided at an absolute minimum resolution of 16 points per square metre under leaf-off conditions. It will be delivered formatted as digital terrain model, a digital surface model and fully classified LAS file format. The Contractor is responsible for carrying out the flight(s) needed to gather the LiDAR data using a helicopter or conventional fixed wing aircraft. Due the large scale of the areas to be covered, the use of drones will not be accepted.
Ammendments to Previous Notice
2. Duration in months: 2. It is expected that the Contract will be delivered within the initial 2 year period. There is an optional extension. period of up to 12 months which will only be taken up in the event that agreed legitimate unforeseen circumstances prevent the delivery. of the contract within the initial period.
Duration in months: years: 2 It is expected that the Contract will be delivered within the initial 2 year period. There is an optional extension period of up to 12 months which will only be taken up in the event that agreed legitimate unforeseen circumstances prevent the delivery of the contract within the initial period.
CPV Codes
- 71354100 - Digital mapping services
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** Please note that the CfT core information and the Contract Notice at II.2.7 stated that the contract period is 2 months. This should state ‘2’ years’ as detailed in the Contract Documents and notice at II.2.11 ‘It is expected that the Contract will be delivered within the initial 2 year period. There is an optional extension period of up to 12 months which will only be taken up in the event that agreed legitimate unforeseen circumstances prevent the delivery of the contract within the initial period.’ A revision of the Core Information and Corrigendum have been made
Reference
- ocds-h6vhtk-02e91c
- FTS 025006-2021