Ynysarwed Mine Water Treatment Scheme upgrade to High Density Sludge Treatment Plant Design and Build
A Contract Award Notice
by THE COAL AUTHORITY
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 19 month
- Value
- £5M
- Sector
- CONSTRUCTION
- Published
- 28 Feb 2022
- Delivery
- 23 Dec 2021 to 30 Jul 2023
- Deadline
- 17 Sep 2021 16:00
Concepts
Location
1 buyer
- Coal Authority Mansfield
1 supplier
- Kier Integrated Services Sandy
Description
Specialist contractor to undertake the design, construction and commissioning of a new high-density sludge treatment plant and decommissioning of the existing treatment plant. • The project objectives; • Replace the existing Treatment Plant with a High Density Sludge (HDS) plant; • Improve the scheme from an operational, environmental and health and safety perspective; • Improve the longevity and resilience of the scheme; • Provide efficiencies with improved chemical dosing and other controls; • Reduce operational costs; • Assess, record and reduce the carbon emissions associated with the life of the scheme; • Identify cost efficiencies; • Reduce risk of pollution of the River Neath and the Neath Canal; • Comply with the existing discharge consents; • Minimise the downtime of the existing scheme during construction; • Develop plans for the assessment, measurement, and continual improvement of waste management, sustainability and carbon impact for the construction, operation and decommissioning of the scheme.
Award Detail
1 | Kier Integrated Services (Sandy)
|
CPV Codes
- 45000000 - Construction work
Indicators
- Contract is suitable for SMEs.
Other Information
Reference
- CA18/4973
- CF fbecf53a-c6fe-42a4-b0fa-538238f7edc7