DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME
A Contract Award Notice
by CPD - CONSTRUCTION DIVISION
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- not specified
- Value
- £5M
- Sector
- CONSTRUCTION
- Published
- 09 Mar 2022
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Northern Ireland: Upstream and downstream.from New Bridge on the Bryansford Road, Newcastle, County Down
1 buyer
- CPD Construction Division Belfast
1 supplier
- Dawson Wam Bedford
Description
The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.
Award Detail
1 | Dawson Wam (Bedford)
|
Award Criteria
Quality | 30 |
price | 70 |
CPV Codes
- 45200000 - Works for complete or part construction and civil engineering work
- 45240000 - Construction work for water projects
- 45262211 - Pile driving
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** CPD, in its capacity as a central purchasing body, is managing this procurement procedure on behalf of the contracting authority which.... is The Department for Infrastructure. The Contracting Authority expressly reserves the right to award one, some, all. or no Lots; . ii. not. to.. award any contract/framework agreement as a result of the procurement process commenced by publication of. this notice or to. cancel.. the procurement at any stage; and. iii. to make whatever changes it may see fit to the content and structure of the. tendering. competition.. and in no circumstances will the Authority be liable for any costs incurred by Economic Operators or Candidates.. Any. expenditure, work.. or effort undertaken prior to contract award is accordingly at the sole risk of the Economic Operator or Candidate.. participating in this.. procurement process. No business whatsoever is guaranteed under any resulting framework agreement or contract.. indeed there is no.. guarantee that any framework agreement or contract will be put in place in relation to this notice. No compensation.. etc will be paid if a.. contract or framework agreement is withdrawn for any reason. Economic Operators should take part in this process.. only on the basis.. that they fully understand and accept this position
Reference
- ocds-h6vhtk-02889c
- FTS 006413-2022