Design & Supply of material (excludes installation) to enable the fitment of Single Variable Rate Sanding Equipment to 10 x Class 158 Units and 29 x Class 159 Units
A Prior Information Notice
by FIRST MTR SOUTH WESTERN TRAIN LIMITED
- Source
- Find a Tender
- Type
- Contract (Goods)
- Duration
- 4.5 month
- Value
- ___
- Sector
- TRANSPORT
- Published
- 10 Jun 2022
- Delivery
- 19 Dec 2022 to 28 Apr 2023
- Deadline
- 11 Jul 2022 00:00
Concepts
Location
South West England: Delivery of associated products and activities are at SWR's Bournemouth Depot
1 buyer
Description
South Western Railway (SWR) invite expressions of interest for the supply and delivery of full design work and material to enable the fitment of Single Variable Rate sanding equipment to 10 x Class 158 units and 29 x Class 159 units; to include an agreed level of strategic spare material.
Lot Division
1 |
South Western Railway (SWR) invite expressions of interest for the supply and delivery of full design work and material to enable the fitment of Single Variable Rate sanding equipment to ten Class 158 units and 29 Class 159 units; to include an agreed level of strategic spare material. Interested parties should include an equipment warranty period, and provide, for SWR retention, technical documentation, schematic drawings, fault finding guides and material specifications. … Additional information: SWR are expecting to combine requirements with another train operator to demonstrate leverage value and collaboration opportunities. |
2 | SWR are expecting to combine requirements with another train operator to demonstrate leverage value and collaboration opportunities. Additional information: SWR are expecting to combine requirements with another train operator to demonstrate leverage value and collaboration opportunities. |
CPV Codes
- 34600000 - Railway and tramway locomotives and rolling stock and associated parts
- 34000000 - Transport equipment and auxiliary products to transportation
Indicators
- Restrictions apply to the lot award allocation.
Other Information
Interested parties should include equipment warranty period, and provide, for SWR retention, technical documentation, schematic drawings, fault finding guides and material specifications. The installation of the modification will be carried out by SWR between December 2022 and April 2023 at Bournemouth Depot, therefore SWR will require detailed designs, installation, and testing instructions. Interested parties should also provide an option for on-site support at Bournemouth depot during first in class fitment and testing. For the avoidance of doubt, interested parties are not required to include costs for installation. A specification of requirements will be provided as part of the tender process. ** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-034513
- FTS 015982-2022