Re-levelling of concrete slabs in Kennington Park Skate bowl

A Tender Notice
by LONDON BOROUGH OF LAMBETH

Source
Contracts Finder
Type
Contract (Works)
Duration
1.5 month
Value
£25K-£100K
Sector
CONSTRUCTION
Published
13 Jun 2022
Delivery
18 Jul 2022 to 05 Sep 2022
Deadline
04 Jul 2022 12:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

Description

Lambeth Council wish to appoint a specialist groundworks contractor to carry out re-levelling of pre-cast concrete slabs which make up the structure of the Kennington Park Skate bowl. The skate bowl was designed and installed in Kennington Park in 1978, part of the revolutionary design known as "Radical Banking", which used a system of pre-cast concrete banked and flat-slab elements to create a skateable bowl. Over the years the slabs have differentially settled and become mis-aligned. In 2012 an attempt to repair and add to the existing facility was made, with a nominal concrete skim to the top with some new additional skate ramps. Whilst this temporarily dealt with the gaps between the units from differential settlement, this has now cracked leaving the facility in a worst state of repair than before. Causing issues with drainage and cracks in the joints and un-level surface. The original concrete slabs had moved exposing many large gaps between the slabs. Due to the issues posed with health and safety the bowl was subsequently closed to the public. The intention now is to renovate the bowl and bring it back into normal use

CPV Codes

  • 45212140 - Recreation installation
  • 45212200 - Construction work for sports facilities
  • 45223820 - Prefabricated units and components
  • 45262310 - Reinforced-concrete work
  • 45262311 - Concrete carcassing work
  • 45262330 - Concrete repair work

Indicators

  • Contract is suitable for SMEs.
  • Contract is suitable for VCOs.

Other Information

Contractors are invited to submit priced proposal for the renovation of this iconic facility. Please refer to the attached documentation for further information and how to apply. Clarifications deadline is 27 June 2022. Submission deadline is: 4 July 2022. 1. Instruction for Quotation Final 2.pdf 2. Appendix B - Method Statements.docx 3. Appendix C -Kennington Park Skate bowl Pricing Schedule V2.xlsx 4. Appendix D - Topographical survey - DRAWING SKATE PARK KENNINGTON 1 TO 100@A3.pdf 5. Appendix E - Kennington Park Skatebowl Structural Report_210329.pdf 6. Appendix F - Tree Assessment.pdf 7. Appendix G - Location map.docx 8. Appendix H - Sustainable Construction Policy.pdf 29471 SK500 Re-levelling typical details.pdf 29471 SK501 Panel support arrangement.pdf 29471 SK502 Levelling method OPTION 1.pdf 29471 SK503 Levelling method OPTION 2.pdf 29471 SK510 General notes for re-levelling works.pdf

Reference

Domains