New build Milford Diagnostics Centre for MRI and CT Diagnostics Imaging at Milford Hospitalv2

A Tender Notice
by HEALTHCARE PARTNERS LTD

Source
Find a Tender
Type
Contract (Works)
Duration
2 year
Value
___
Sector
CONSTRUCTION
Published
09 Sep 2022
Delivery
01 Feb 2023 to 01 Feb 2025
Deadline
30 Sep 2022 14:00

Concepts

Location

United Kingdom:

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The Royal Surrey NHS Foundation Trust propose to develop a new-build facility for Magnetic Resonance Imaging (MRI) and Computed Tomography Imaging (CTI) at the Milford Hospital, Tuesley Lane, Godalming, Surrey GU7 1UF. The building is single-storey with a link corridor to the existing Rehabilitation Building at Milford Hospital. The building also has plant rooms and a service yard with an acoustic fence to accommodate the mechanical and electrical services at the rear. Associated works include the construction of a new access road from Tuesley Lane that will be initially used for construction, and on completion will be re-surfaced for maintenance, servicing, deliveries and access for waste-bin vehicles. Also proposed is the provision of additional car parking for 18 cars, 3 motorbikes, and 6 bicycle racks, the erection of an electricity substation, and the installation of foul drainage and attenuation soakaway for SUDS drainage The site was considered suitable and viable for this f

Total Quantity or Scope

The site was considered suitable and viable for this facility as it would help the Royal Surrey NHS Foundation Trust in its quest to be become a pre-eminent cancer hub in the South-East of England. Milford Hospital already provides plain X-Ray and ultrasound facilities and the location of MRI and CT diagnostic imaging will suitably complement the existing facilities and widen the scope of available diagnostic imaging services across the Royal Surrey Hospital sites.Milford Hospital lies in a site of approximately 2.3hectares. It accommodates a 1980s ward block known as the Rehabilitation Building having an area of 1,764m2, a 1½ storey newly refurbished X-Ray block of 122m2, a two-storey Victorian building for Community Services Management offices, a small, detached building shed and a redundant building. The site for the new diagnostics centre is the grassed area to the east of the Rehabilitation Building and bounded by a wooded strip to the north and the east towards Tuesley Lane. The new Milford Diagnostics Building is 1,963.15m2 consists of:• Clinical Facilities:o 2no MRI Scanner Rooms, Control Rooms, Engineering Technical Roomso 1no CT Scanner Room, Control Roomo Patient Cannulation Roomso Counselling and Interview Roomso Recovery Roomso Patient Changing Roomso Patient WCso Clean and Dirty Utility Rooms• Staff and Non-Clinical Facilitieso Reception o Main Waiting Roomo Sub-Waiting Room for CTo Officeso Staff Changing Roomso Staff WCs• Mechanical and Electrical Services o Service Yardo Plant Roomo Generator Roomo Medical Gas Storageo Low Voltage Electrical Roomo Oil Bunding Tanko Service Void floor in the roof space above the ground floor accommodation with 3no roof access shafts into the service void.o Bin Enclosureo Acoustic FencingAssociated works consist of:• External Workso Access Road from Tuesley Lane for construction phaseo Access Road for maintenance, service, and deliveries to the completed buildingo Access road barriero Retaining walls for access road, and service compoundo Car park for 18 cars, 3 motorbikes, 5 bicycle rackso Attenuation tank for SUDS drainageo External lightingo Reinstating of existing fire hydrants for firefighting.o A soft landscaping scheme to form a wooded boundary to the site to be managed by the Trust. o Surface water and foul drainageSpecialist Suppliers consist of:• SIEMENS - Suppliers of the MRI Scannerso Magnetom Sola 1.5 Teslao Magnetom Vida 3.0 Tesla• GE Healthcare – Suppliers of the CT Scannero Revolution ASCEND• EEP – European EMC Products - Suppliers of the Reinforced Faraday CageAs the rest of the hospital will be in use, the site will be fully cordoned off with access directly from the new road from Tuesley Lane. The existing access to the Hospital is to be maintained for the patients and staff to the other facilities at Milford Hospital. The site is a brownfield site. Initial ground surveys indicate the presence of obstructions in the ground. It is envisaged that these could be remnant footing

CPV Codes

  • 45215120 - Special medical building construction work
  • 45000000 - Construction work
  • 45215000 - Construction work for buildings relating to health and social services, for crematoriums and public conveniences

Indicators

  • Variant bids may be considered.
  • This is a recurring contract.
  • Renewals are not available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains