Lower Chance Access Track

A Contract Award Notice
by DEFRA NETWORK ETENDERING PORTAL

Source
Contracts Finder
Type
Contract (Works)
Duration
6.5 month
Value
£145K
Sector
CONSTRUCTION
Published
14 Sep 2022
Delivery
12 Sep 2022 to 31 Mar 2023
Deadline
05 Aug 2022 17:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

Description

Installing new access track from the existing concrete road near our observation borehole along the byway and across the fields footpath to the Ridgway track. The track will be 3m wide and approx. 450m in length. Construction to be 200-300mm compacted granular hardcore base on a excavated, levelled and compacted native soil. With 50-75mm depth of crushed concrete on top (potentially cell grid system) and edge protection. Manufacture and installation of Steel Hollow 4m wide security gate including on-site modifications with welder. Type of 100mm x 100mm square tube gates with security boxed padlock system (see picture for further details).

Award Detail

1 Breheny Civil Engineering (Ipswich)
  • Value: £144,884

CPV Codes

  • 45220000 - Engineering works and construction works

Indicators

  • Contract is suitable for SMEs.

Other Information

n/a 36659 - Lower Chance Access Track - NEC4 ECSC_V3 signed_Redacted.pdf

Reference

Domains