M20 Moveable Barrier Permanent Solution Stage 2 (via CCS RM6088)
A Contract Award Notice
by HIGHWAYS ENGLAND
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 11.5 month
- Value
- £20M-£31M
- Sector
- CONSTRUCTION
- Published
- 03 Oct 2022
- Delivery
- 03 May 2022 to 13 Apr 2023
- Deadline
- 25 Apr 2022 17:00
Concepts
Location
1 buyer
- Highways England Birmingham
1 supplier
- Balfour Beatty Construction Holytown
Description
The M20 Moveable Barrier Solution is a 2-stage project; inasmuch that the plan is to have two separate operational plans. The overall aim of the scheme is to provide on-road queuing capacity on the M20 coast bound carriageway between J8 and J9 for port-bound freight traffic to minimise disruption on the Kent Strategic and Local Road Networks in the event of Cross-Channel disruption. Stage 1 delivered a solution to address potential delays caused by additional customs and immigrations checks due to legislative change associated with UK's exit from the EU in January 2021. Stage 2 (Phase 1) is a longer-term permanent solution to address delays arising from planned or unplanned emergency events that disrupt port traffic, such as bad weather affecting Channel crossing conditions. Stage 2 (Phase 2) - this contract - comprises delivery of permanent highway infrastructure to enable a traffic management contra-flow operational solution to be rapidly deployed on the M20 London bound carriageway between J8 and J9 using Moveable Barriers, while port-bound freight is queued on the coast bound carriageway. There are typically 2 emergency events per year each lasting up to 5 days only. Each emergency activation is to be delivered within a 48-hour period to permit resource mobilisation and to include a 12-hour deployment period.
Award Detail
1 | Balfour Beatty Construction (Holytown)
|
CPV Codes
- 45233110 - Motorway construction works
- 45233139 - Highway maintenance work
Reference
- tender_296461/1110859
- CF d2403a01-99c1-49a8-9646-8265d7d77916