North Taunton and Oake Woolaway Refurbishment

A Tender Notice
by SOMERSET WEST AND TAUNTON COUNCIL

Source
Find a Tender
Type
Contract (Works)
Duration
19.5 month
Value
___
Sector
CONSTRUCTION
Published
21 Oct 2022
Delivery
To 17 Jul 2024 (est.)
Deadline
25 Nov 2022 12:00

Concepts

Location

Somerset:

Geochart for 1 buyers and 0 suppliers

Description

This procurement is being conducted as an Open Procedure in compliance with Somerset West and Taunton contract Standing Orders. The opportunity is being advertised via the Procontract portal, Contracts Finder and the Find a Tender Service in compliance with PCR2015 Procurement Regulations. If an Applicant is bidding for both Lots, a completed set of tender documents must be submitted separately for each Lot. At the conclusion of the Award stage, the intention is to award the Contract to one or two Applicants for Lots 1 and 2. Lot 1 Refurbishment of Woolaway Houses North Taunton – Phase E Lot 2 Refurbishment of Woolaway Houses Oake The Works comprise the complete refurbishment of the properties on the basis that all the external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full package of internal replacement and upgrading is provided all as shown and described on the tender and contract drawings and the specifications

Lot Division

1 Refurbishment of Woolaway Houses North Taunton – Phase E
  • Duration: 10 month

The Works comprise the complete refurbishment of the properties on the basis that all the external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full package of internal replacement and upgrading is provided all as shown and described on the tender and contract drawings and the specifications. The Works will be executed in Sections using the following parameters: Section 1: Works to 4 Bodmin Road; 9, 25 & 27 Dorchester Road Date of Possession to be 4 calendar weeks after the signing of the JCT Contract. The Date for Completion to be 20 calendar weeks after the Date of Possession. Section 2: Works to 17, 23, 33 & 35 Dorchester Road Date of Possession to be 2 weeks after the completion of Section 1. The Date for Completion to be 16 calendar weeks after the Date of Possession.

2 Refurbishment of Woolaway Houses Oake
  • Duration: 19.5 month

The Works comprise the complete refurbishment of the properties on the basis that all the external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full package of internal replacement and upgrading is provided all as shown and described on the tender and contract drawings and the specifications. The Works will be executed in Sections using the following parameters: Section 1: Works to 21, 23 and 24 Oake Close Date of Possession to be 4 calendar weeks after the signing of the JCT Contract. The Date for Completion to be 20 calendar weeks after the Date of Possession. Section 2: Works to 17, 18 and 19 Oake Close Date of Possession to be 2 weeks after the completion of Section 1. The Date for Completion to be 16 calendar weeks after the Date of Possession. Section 3: Works to 2, 3 and 4 Oake Close Date of Possession to be 2 weeks after the completion of Section 2. The Date for Completion to be 16 calendar weeks after the Date of Possession. Section 4: Works to 25 Oake Close Date of Possession to be 2 weeks after the completion of Section 3. The Date for Completion to be 16 calendar weeks after the Date of Possession.

CPV Codes

  • 45211000 - Construction work for multi-dwelling buildings and individual houses
  • 45210000 - Building construction work

Indicators

  • Restrictions apply to the lot award allocation.
  • This is a one-off contract (no recurrence)
  • Renewals are not available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains