Framework Agreement for Mechanical and Associated Works 2023-2025 (2027) for works up to a value of £500,000
A Tender Notice
by WIGAN COUNCIL
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- 4 year
- Value
- £10M
- Sector
- INDUSTRIAL
- Published
- 09 Dec 2022
- Delivery
- To 30 Dec 2026 (est.)
- Deadline
- 20 Jan 2023 17:00
Concepts
Location
Greater Manchester:
1 buyer
- Wigan Council Wigan
Description
Wigan Council is seeking to procure a panel of contractors to be part of a framework agreement for mechanical and associated works for works up to a value of £500,000 per project. The scope of works within this framework is mechanical and associated works; this includes, but is not limited to: • Boiler replacement, alterations to heating systems, pump replacement and the like (requirements for these works will arise in Lot 1 and Lot 2). • Decarbonisation works including Air Source Heat Pumps (Lot 1 & 2), solar thermal / PV (Lot 1 & 2), Ground Source Heat Pumps (Lot 2), Biomass Boilers (Lot 2), and the like. Bidders must be able to deliver both conventional Boiler/heating related type works and those Decarbonisation works within the scope of the relevant Lot (as detailed above) in respect of the value Lots to which they are applying. The framework agreement will consist of 2 lots. Lot 1 will deliver works up to a value of £150,000 per project and Lot 2 will deliver works having a value of between £150,000 and £500,000 per project. All contractors appointed to the framework must be able to undertake projects to the upper project cost limit for the lot(s) to which they are applying. Individual contracts raised under the framework agreement can commence at any time during the period of the framework. The Framework Agreement will run for an initial period of 2 years and may be extended for two further periods of 12 months each. It is intended to appoint between 5 and 10 contractors per Lot. These will be the top 5 to 10 highest scoring bidders provided there are sufficient compliant and satisfactory responses received under the tender process. The framework agreement will be available for use by all directorates within Wigan Council and schools in the borough of Wigan. There will be potential for partner organisations and other areas of the Council to use the framework, as detailed within the Invitation to Tender documentation. The deadline for the submission of tender bids is Friday 20th January 2023 at 17:00.
Total Quantity or Scope
The Framework Agreement for Mechanical and Associated Works 2023-2025 (2027) will consist of 2 lots. Lot 1 will deliver works up to a value of GBP 150 000 per project and Lot 2 will deliver works that have a value of between GBP 150 000 and GBP 500 000 per project. All contractors appointed to the framework must be able to undertake projects to the upper project cost limit for the lot(s) to which they are applying. It is intended to appoint the top 5 to 10 highest scoring bidders on each lot provided there are sufficient compliant and satisfactory responses received under the tender process. … The framework agreement will be open for use to all directorates within Wigan Council and schools in the borough of Wigan. There will be potential for partner organisations and other areas of the Council to use the framework, as detailed within the Invitation to Tender documentation. Individual contracts raised under the framework agreement can commence at any time during the period of the framework agreement. Wigan Council makes no guarantee as to the volume of business on offer through this framework agreement. The estimated total financial value of works to be put through the framework over its potential full four-year period is only for indicative purposes and the actual value of works will be dependent on a range of factors. Additional information: The Framework Agreement will run for an initial period of 2 years and may be extended for two further periods of 12 months each. With respect to section II.2.7, the duration of 48 months would be if the framework was extended for its maximum period.
CPV Codes
- 45331110 - Boiler installation work
- 09332000 - Solar installation
- 42511110 - Heat pumps
- 44622000 - Heat-recovery systems
- 45331000 - Heating, ventilation and air-conditioning installation work
- 45333000 - Gas-fitting installation work
- 45351000 - Mechanical engineering installation works
- 71334000 - Mechanical and electrical engineering services
Indicators
- This is a one-off contract (no recurrence)
- Renewals are not available.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-038c20
- FTS 034878-2022