BBV HS2 MWCC North - Deep Drainage - Micro Tunnelling (WP/CM)
A Contract Award Notice
by BIP SOLUTIONS LIMITED
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 8 month
- Value
- £1
- Sector
- INDUSTRIAL
- Published
- 22 Dec 2022
- Delivery
- 28 Jul 2021 to 31 Mar 2022
- Deadline
- 08 Apr 2021 13:00
Concepts
Location
1 buyer
- BiP Solutions Birmingham
1 supplier
- Active Tunnelling Exhall
Description
Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts, lots N1 and N2. We are looking to engage with the supply chain whom provide Deep Drainage/ Micro Tunnelling works. This package of works includes two pipeline runs to be installed. The two pipes are different in diameter, one being 600mm & the other is a 1500 mm. The length of 1500 mm pipe featured is approximately 1190 metres. The peak depth of the install features at 11.90 metres BGL. A 600 mm pipe is also featured and this will also convey waters between the Marston Lane inlet, to an outlet planned at the rear of the Kingsbury Compound settlement pond. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
Award Detail
1 | Active Tunnelling (Exhall)
|
CPV Codes
- 43120000 - Coal or rock cutters and tunnelling machinery, and boring or sinking machinery
- 43300000 - Construction machinery and equipment
- 43614000 - Parts of tunnelling machinery
- 45000000 - Construction work
Other Information
Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=54714...
Reference
- C4A54714497
- CF 34985aab-14aa-4928-a62d-3718c1020d04