Design and Build of Solar PV Farms and Nethermains, Kilwinning and Shewalton, Irvine
A Contract Award Notice
by NORTH AYRSHIRE COUNCIL
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- not specified
- Value
- £16M
- Sector
- CONSTRUCTION
- Published
- 09 Mar 2023
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Kilwinning and Irvine
1 buyer
- North Ayrshire Council Irvine
1 supplier
- Ameresco London
Description
North Ayrshire Council invites tenders for the design and build of two solar PV farms – one at Nethermains, Kilwinning and the other at Shewalton, Irvine as detailed in the Invitation to Tender. The tender will be split into 3 lots, as detailed below, and North Ayrshire Council intend to award either Lots 1 and 2 or Lot 3. The award will be based on what is affordable and best value for North Ayrshire Council. Lot 1 Nethermains, Kilwinning Lot 2 Shewalton, Irvine Lot 3 Nethermains, Kilwinning & Shewalton, Irvine Tenderers who wish to bid for both Lot 1 and Lot 2 and encouraged to also submit a bid under Lot 3. The contract period will be 64 months (up to 6 months for design, up to 10 months for build, 12 months operation and 48 months maintenance). Design and build must be completed by April 2024 for both sites in order to meet grid connection. The anticipated start date is 4th January 2023 until 28th April 2028 with the option to extend operation by up to 6 months until 31st October 2028, and maintenance by up to 16 years until 29th April 2044. Operation and maintenance will run together in year one and potentially year two if the operation extension is utilised, thereafter maintenance will run as a standalone element. Extensions will be at the sole discretion of NAC and subject to satisfactory performance and funding. The contract(s) will be let under the NEC4 Design, Build and Operate Contract.
Total Quantity or Scope
North Ayrshire Council invites tenders for the design and build of two solar PV farms – one at Nethermains, Kilwinning and the other at Shewalton. Lot 3, if awarded, will be for a period of 64 months (up to 6 months for design, up to 10 months for build, 12 months operation and 48 months maintenance). Design and build must be completed by April 2024 for both sites in order to meet grid connection. Lot 3 will be split into 3 phases – phase 1 is for the design aspect (of both farms), phase 2 is for the build, operation and maintenance aspects of the Nethermains site and phase 3 is for the build, operation and maintenance aspects of the Shewalton site. North Ayrshire Council reserve the right to award one or all phases, subject to budget and satisfactory completion of each stage. For evaluation purposes pricing for all phases will be considered and awarded to the most economically advantageous tenderer (depending on which lot(s) are awarded).
Award Detail
1 | Ameresco (London)
|
Award Criteria
Solar PV Design and Equipment | 15 |
Solar PV Programme of Works | 12 |
Operation and Maintenance | 9 |
Health and Safety | 4 |
price | 60 |
CPV Codes
- 45200000 - Works for complete or part construction and civil engineering work
- 09300000 - Electricity, heating, solar and nuclear energy
- 09330000 - Solar energy
- 09331000 - Solar panels
- 09331200 - Solar photovoltaic modules
- 09332000 - Solar installation
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** Quality Management Procedures 1. The bidder must hold a UKAS (or equivalent) accredited independent third-party certificate of compliance in accordance with BS EN ISO 9001 (or equivalent) or a documented policy regarding quality management, see attachment at SPD question 4D.1. Health and Safety Procedures 1. The bidder must hold a UKAS (or equivalent) accredited independent third-party certificate of compliance in accordance with BS OHSAS 18001 or ISO 45001 (or equivalent) or have, within the last 12 months, successfully met the assessment requirements of a construction-related scheme in registered membership of the Safety Schemes in Procurement (SSIP) forum or the bidder must have a regularly reviewed and documented policy for Health and Safety management, see attachment at SPD question 4D.1. Environmental Management Procedures 1. The bidder must hold a UKAS (or equivalent) accredited independent third-party certificate of compliance in accordance with BS EN ISO 14001 (or equivalent) or a valid EMAS (or equivalent) certificate or the bidder must have a regularly reviewed documented policy regarding environmental management, see attachment at SPD question 4D.2. Bidders may be excluded from this competition if they are in any of the situations referred to in regulation 58 of the Public Contracts (Scotland) Regulations 2015. (SC Ref:725312)
Reference
- ocds-h6vhtk-03b0cc
- FTS 006851-2023