Ctrl Hub Safety Assurance System
A Contract Award Notice
by NORTHERN GAS NETWORKS LIMITED
- Source
- Find a Tender
- Type
- Contract (Services)
- Duration
- not specified
- Value
- £1M
- Sector
- TECHNOLOGY
- Published
- 04 Apr 2023
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
West Yorkshire:
1 buyer
- Northern Gas Networks Leeds
1 supplier
- CTRL Hub Gateshead
Description
Control Hub is NGN's curent system for DSP contract assurance, used both by NGN and Supplier to ensure visibility on plant/equipment/vehicles and personnel qualifications/STC/training records. This system also feeds into NGN's Occupational Health Surviellence programme. NGN issue work through the system via Control Hub, project designs and all utility plans, customer infomation including vunerable customer details. P&R workload is requested via Control Hub, and service record cards and all reinstatement measures are also recorded on Control Hub by contractor engineers.
Award Detail
1 | CTRL Hub (Gateshead)
|
CPV Codes
- 72000000 - IT services: consulting, software development, Internet and support
Legal Justification
This contract is awarded to Ctrl Hub. The reasons for this are - • It is currently a very integrated NGN bespoke built system - linked to NGN SAP, NGN GSOS which if replaced would see significant integration costs (up to £1m) This notice is issued on the following basis - in the case of supply contracts for additional deliveries by the original supplier which are intended either as a partial replacement of supplies or installations or as the extension of existing supplies or installations, where a change of supplier would oblige the utility to acquire supplies having different technical characteristics which would result in incompatibility or disproportionate technical difficulties in operation and maintenance.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** This contract is awarded to Ctrl Hub. The reasons for this are - • NGN need a 'ready' system • Training costs would need to be absorbed by the Supplier for all staff with no disruption • It is currently a very integrated NGN bespoke built system - linked to NGN SAP, NGN GSOS which if replaced would see significant integration costs (up to £1m)
Reference
- ocds-h6vhtk-03bc53
- FTS 009764-2023