NCC1152 NEP1 Stock Pile Removal

A Tender Notice
by ADVANCE NORTHUMBERLAND LIMITED

Source
Contracts Finder
Type
Contract (Works)
Duration
1.5 month
Value
£140K
Sector
CONSTRUCTION
Published
03 May 2023
Delivery
26 Jun 2023 to 18 Aug 2023
Deadline
26 May 2023 11:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Advance Northumberland (Developments) Limited, trading as Advance Northumberland (Developments) Ltd requires bulk material removal from 1 location within our development portfolio resulting from construction work. Northumberland Energy Park, NEP1 - Former Blyth Power Station Site, Brock Lane, East Sleekburn, Cambois, Northumberland NE22 7BW Estimated volume: 13,000 cubic metres. The materials to be disposed of are construction and demolition waste arising from the dock excavation and construction works, including crushed concrete, fill from the time of the power station construction, infill from demolition and excavation of underlying natural ground materials and soil. The spoil has been placed in three separate stockpiles, named C2S, SSM1 and SSM2, which have been sampled for potential contaminants and Waste Acceptance Criteria (WAC) testing.

CPV Codes

  • 45100000 - Site preparation work
  • 90500000 - Refuse and waste related services

Indicators

  • Contract is suitable for SMEs.

Other Information

Advert https://procontract.due-north.com/Advert?advertId=7431adaa-b3e9-ed11-8122-005056...

Reference

Domains