HMS Warrior Dry Docking & Moorings Professional Team PIN

A Prior Information Notice
by NMRN OPERATIONS

Source
Find a Tender
Type
Contract (Works)
Duration
not specified
Value
£0-£1
Sector
CONSTRUCTION
Published
19 May 2023
Delivery
not specified
Deadline
n/a

Concepts

Location

Portsmouth

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

HMS Warrior was built in 1860, is berthed at the National Museum of the Royal Navy (NMRN) Portsmouth and was last dry-docked in 2004 in the Portsmouth Naval Base (PNB). NMRN are planning to dry-dock HMS Warrior for hull, onboard moorings and rigging maintenance, when a dry-dock is available within the PNB. The availability of a dry-dock is dependent on Royal Navy requirements so the dry-docking may be during the winter of 23/24 or winter 24/25. Whilst the ship is in dry-dock, the permanent sea moorings are to be serviced or renewed and her berth dredged. HMS Warrior was the Royal Navy’s first iron hulled warship, launched in 1860 in Blackwall, London. The ship featured innovations such as hybrid propulsion of steam engines and sail, and advanced weaponry for the time.The speed of innovations at the time meant she was placed in reserve a mere 12 years after commissioning. Warrior became a training ship, then an oil hulk in Pembroke, Wales until being saved for preservation in 1979. She was fully restored at Hartlepool before returning to Portsmouth in 1987. The proposed scope of works can be found on the link to Contracts Finder for the specific Lots that will be undertaken with this project. These requirements may change in scope and available funding, so this is currently indicative of at the time of writing. Clarifications or registering of interest must be done by emailing tenders@nmrn.org.uk The NMRN have provisionally indicated the tender for this might begin in July 2023, but this may change as it is currently provisional. PIN Notice in full can be found here; https://www.contractsfinder.service.gov.uk/Notice/f55d85ab-33de-425c-82de-c2a5ef...

Total Quantity or Scope

It is currently at the PIN stage, which will then go out to tender as an Open Procedure. The NMRN will likely split the work into Lots, but it is dependant on funding and timeline of the work to be carried out.

CPV Codes

  • 45244000 - Marine construction works
  • 50200000 - Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment
  • 71250000 - Architectural, engineering and surveying services
  • 71354500 - Marine survey services
  • 71317210 - Health and safety consultancy services

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. ** NOTE: To register your interest in this notice and obtain any additional information please visit the myTenders Web Site at https://www.mytenders.co.uk/Search/Search_Switch.aspx?ID=229444. (MT Ref:229444)

Reference

Domains