BHCC JB BlackRock Waterfront Enabling Package 2a - Sea wall - AWARD

A Contract Award Notice
by BHCC CITY REGENERATION AND DEVELOPMENT

Source
Contracts Finder
Type
Contract (Works)
Duration
1 year
Value
£2M
Sector
CONSTRUCTION
Published
26 May 2023
Delivery
05 Apr 2021 to 06 Apr 2022
Deadline
25 Mar 2021 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

The Brighton Black Rock Sea Wall Realignment works, is part of the larger Black Rock Site Enabling and Public Realm Works commissioned to develop the Brighton Black Rock frontage. This specification is solely dedicated to the Coastal Sea Wall Realignment works. Site preliminaries apart from information relating to testing and sampling of materials covered by this specification will be provided in a separate document. All landward elements including promenade, drainage and landscape features are not part of this document. The works to be provided as part of the scheme include: 1. Construction of new concrete clad sheet pile wall approximately 215m long, tying into the Brighton Marina Harbour arm in the east and the existing seawall defences in the west. One bridging detail over an existing concrete groyne. 2. Demolishing existing seawall to a level of +2mOD. 3. Reinstatement of shingle beach adjacent to new seawall following construction works. 4. Installation of weep holes through new seawall.

Award Detail

1 JT Mackley (Small Dole)
  • Value: £1,742,000

CPV Codes

  • 45243300 - Sea wall construction work

Indicators

  • Contract is suitable for SMEs.

Reference

Domains