Fit Out - Ancillary Metalwork -WP12.3 - Old Oak Common (S4) Station
A Tender Notice
by BALFOUR BEATTY VINCI SYSTRA JV
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 3 year
- Value
- £2M-£5M
- Sector
- CONSTRUCTION
- Published
- 06 Jun 2023
- Delivery
- 01 Apr 2025 to 31 Mar 2028
- Deadline
- 23 Jun 2023 07:00
Concepts
Location
1 buyer
- Balfour Beatty VINCI Systra Watford
Description
WP12.3 Ancillary Metalwork Scope of work: The ancillary metalwork package consists of non-architectural metalwork fixed utilitarian access, balustrades/ guardrails, handrails, barriers, guards, and staircases predominately to back of house (BoH) areas for the HS2 station incorporating the Great Western Main Line (GWML) conventional station and Shared Accommodation Building (SAB), and comprises of the following scope: Detailed design, supply and installation of station ancillary metalwork to the SAB, GWML and HS2 station areas, including all associated testing and certification of the works. Metalwork to be fully coordinated with substrates and BoH finishes, including Mechanical, Electrical, Plumbing & Heating (MEPH). Provide RIBA 5 design including but not limited to fabrication drawings showing general arrangements, elevations, interface details, fixings details, components and performance requirements for construction.
CPV Codes
- 45262670 - Metalworking
- 45223100 - Assembly of metal structures
- 45223110 - Installation of metal structures
Indicators
- Contract is suitable for SMEs.
Other Information
No Documentation is included at this point. Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=71389...