The Pirbright Institute Brooksby Building - SIL 1 HVAC Shutdown System from Overpressure and Underpressure Hazard Scenarios
A Tender Notice
by THE PIRBRIGHT INSTITUTE
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 1 year
- Value
- £80K-£100K
- Sector
- INDUSTRIAL
- Published
- 15 Jun 2023
- Delivery
- 01 Sep 2023 to 31 Aug 2024
- Deadline
- 11 Jul 2023 13:00
Concepts
Location
1 buyer
- Pirbright Institute Woking
Description
Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design and construction of a safety system that detects overpressure and underpressure of various areas and rooms in the Brooksby facility. The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans. As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1. Safety Requirement System (SRS) attached at the back of this document for more detail. Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511. A non-exhaustive list of typical deliverables for such a project is as follows: • Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves) • Bill of Materials (BoM) for all materials and accessories to be purchased • Quotations for all required materials • Functional logic diagrams (if required) • I/O lists • Functional Design Specifications (FDS) • Loop diagrams • Instrument wiring diagrams • Electrical wiring diagrams • Control panel layout and drawings • Safety Integrity Level (SIL) Verification report • SIL certifications for all relevant hardware (if available) • Factory Acceptance Test (FAT) procedures • Site Acceptance Test (SAT) procedures • Safety Instrumented System (SIS) installation and commissioning plan • SIS validation plan • Safety manuals • Proof test procedure • Spare parts list • Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS).
CPV Codes
- 45331210 - Ventilation installation work
- 71315410 - Inspection of ventilation system
- 71321400 - Ventilation consultancy services
- 71521000 - Construction-site supervision services
- 71530000 - Construction consultancy services
Indicators
- Contract is suitable for SMEs.
Other Information
ITT - Brooksby Building - SIL 1 HVAC Shutdown System from Overpressure and Underpressure Hazard Scenarios.docx Appendix A - Supplier Pre-Qualification Questionnaire.docx Appendix B - Pricing Schedule.xlsx Appendix C - Evaluation Scoring Matrix.pdf Appendix E - Specification documentation, drawings (combined).pdf Appendix F - Form of Offer.docx Appendix G - The Pirbright Institute's use of animals in research.pdf
Reference
- Brooksby/SIL HVAC/2023
- CF 2525728e-4119-414e-b923-c7594bdcc422