J5 Reactive Power Compensation Compound Decommissioning

A Prior Information Notice
by UNITED KINGDOM ATOMIC ENERGY AUTHORITY

Source
Find a Tender
Type
Contract (Works)
Duration
not specified
Value
___
Sector
CONSTRUCTION
Published
10 Jul 2023
Delivery
not specified
Deadline
n/a

Concepts

Location

Oxfordshire: UKAEA, Culham

Geochart for 1 buyers and 0 suppliers

Description

JET Decommissioning and Repurposing J5 Reactive Power Compensation Compound: The J5 Reactive Power Compensation (RPC) compound, is a legacy facility located in the northern area of the Culham Science Campus. Operating from early 1990s to 2012 the purpose of the J5 RPC system (external compound and internal network) was to avoid causing disturbances to the 400kV National Grid supply as a result of large power pulses on site. The RPC compound has been left in a quiescent state since it was disconnected from the Joint European Torus power supplies and mothballed. The J5 RPC compound contains high voltage, low voltage, and extra low voltage electrical equipment including resistors, capacitors (624 high voltage oil filled capacitors to be exact), inductors, and surge arresters along with cable and busbar systems. Please refer to attached documents for further details.

Total Quantity or Scope

Decommissioning and Repurposing: Under the agreement to host the JET machine, when JET finishes operations, the UK retains responsibility for decommissioning the machine and associated facilities. In 2022 the JET Decommissioning and Repurposing programme within UKAEA was set up to review the JET decommissioning plan and identify whether modern technologies and methodologies can be used to decommission smarter, quicker, cheaper, and safer. It was also decided to review alternative end of life scenarios to repurpose plant, equipment, and facilities thereby promoting sustainability and aiding other research and development programmes both domestically and internationally. … The J5 Reactive Power Compensation (RPC) compound, shown in Figure 1, is a legacy facility located in the northern area of the Culham Science Campus. Operating from early 1990s to 2012 the purpose of the J5 RPC system (external compound and internal network) was to avoid causing disturbances to the 400kV National Grid supply as a result of large power pulses on site.

CPV Codes

  • 45111000 - Demolition, site preparation and clearance work
  • 43322000 - Dismantling equipment
  • 45111100 - Demolition work
  • 45111200 - Site preparation and clearance work
  • 45111300 - Dismantling works
  • 45112000 - Excavating and earthmoving work
  • 45112300 - Infill and land-reclamation work
  • 45112310 - Infill work
  • 45112400 - Excavating work
  • 45112500 - Earthmoving work
  • 45113000 - Siteworks
  • 45222110 - Waste disposal site construction work
  • 90513000 - Non-hazardous refuse and waste treatment and disposal services
  • 90520000 - Radioactive-, toxic-, medical- and hazardous waste services
  • 90523000 - Toxic waste disposal services except radioactive waste and contaminated soil

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains