Modifications to Henderson Dry Dock at the Port of Immingham

A Prior Information Notice
by ASSOCIATED BRITISH PORTS

Source
Find a Tender
Type
Future Contract (Works)
Duration
not specified
Value
___
Sector
CONSTRUCTION
Published
01 Aug 2023
Delivery
not specified
Deadline
n/a

Concepts

Location

London

Geochart for 1 buyers and 0 suppliers

Description

Procurement of the Principal Contractor for the design and construction of works to modify Henderson Dry Dock, remove RORO (Roll On Roll Off) ramps, partially demolish the sill and undertake remodelling works required to the quay. Please respond to this PIN by email to procurement@abports.co.uk

Lot Division

1 Modifications to Henderson Dry Dock at the Port of Immingham Including Increasing the Depth

The aim of this project is to increase the draft of vessels can be accommodated in Henderson Dry Dock. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works including shoring of the HDD (Henderson Dry Dock) walls and cofferdam. Site establishment and preparations. Construction Works - Installing a cofferdam to the front of the Dry Dock; - Pumping out the Dry Dock; - Install temporary works to restrain dry dock walls - Remove and dispose of the remaining sediment to the base of the dry dock; - Break out and remove sill; - Increase the depth of the dry dock by approximately 1m by means of breaking out or planning concrete; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Associated mooring / quay furniture - Removal of cofferdam and other temporary works; - Performance monitoring of the new structure including undertaking surveys during the defects period.

2 Modifications to Henderson Dry Dock at the Port of Immingham Excluding Works Associated with Increasing the Depth

The aim of this project is to modify Henderson Dry Dock to meet business requirements without increasing the depth. The design and construction works to be undertaken by the principal contractor will include, but are not limited to the following main elements: Completion of the design. The Contractor will complete the design of the permanent works and undertake the full design and detail of the temporary works. Site establishment and preparations. Construction Works - Install temporary works to allow breaking out of sill; - Break out and remove sill; - Removal and disposal of the RORO ramps (concrete slab over steel ramp); - Extend broken back Dry dock walls (under RORO Ramp) to ground level and make good surrounding paving; - Removal of temporary works;- Associated mooring / quay furniture

CPV Codes

  • 45240000 - Construction work for water projects
  • 45244000 - Marine construction works
  • 45241100 - Quay construction work
  • 45241400 - Dock construction work
  • 45213342 - Ro-ro terminal construction work