Test Section For The Refractive Index Matched Facility
A Contract Award Notice
by UNIVERSITY OF SOUTHAMPTON
- Source
- Contracts Finder
- Type
- Contract (Products)
- Duration
- 17.5 month
- Value
- £38K
- Sector
- CONSTRUCTION
- Published
- 21 May 2024
- Delivery
- 20 May 2024 to 31 Oct 2025
- Deadline
- 19 Apr 2024 11:00
Concepts
Location
Geochart for 1 buyers and 1 suppliers
1 buyer
- Southampton University Southampton
1 supplier
- Talbot Designs London
Description
One of the flow loops in the RIM facility requires a test section made out of Perspex. The principle of the RIM facility is that the fluid has the same refractive index as the models and the wall. A RIM facility allows for any light (especially from lasers) to pass through the model and fluid without any optical interference, refraction, reflection and shadow formation. The type of material is crucial, as it is the only polymer that has the same refractive index as the solution of NaI.
Award Detail
1 | Talbot Designs (London)
|
CPV Codes
- 44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
Indicators
- Contract is suitable for SMEs.
Reference
- 2024CQE-1201
- CF 8f48822c-b7c9-41c5-be70-2ffb2ca09986