GB-Bristol: Biomass Boiler Project - Kielder Castle

A Contract Award Notice
by FORESTRY ENGLAND FOR AND ON BEHALF OF THE FORESTRY COMMISSION

Source
Contracts Finder
Type
Contract (Works)
Duration
6.5 month
Value
£298K
Sector
INDUSTRIAL
Published
14 Jun 2024
Delivery
12 Jun 2024 to 20 Dec 2024
Deadline
30 May 2024 23:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

Description

Kielder Castle is a Grade II listed building owned by Forestry England. The intention of this project is installing a new biomass boiler in an existing boiler house on the south side of Kielder Burn to provide a renewable heating source to the castle. The works include but are not limited to a new biomass boiler located in an existing boiler house on the south side of Kielder Burn. All works are as detailed in the tender documents.

Award Detail

1 Reheat Renewable Technologies (Alnwick)
  • Value: £297,584

CPV Codes

  • 44600000 - Tanks, reservoirs and containers; central-heating radiators and boilers
  • 50721000 - Commissioning of heating installations

Indicators

  • Contract is suitable for SMEs.

Other Information

The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement. Please follow this link to view the notice https://www.delta-esourcing.com/delta/respondToList.html?noticeId=868727885