HRE - PJM/8 Clifton Hall Tunnel

A Contract Award Notice
by NATIONAL HIGHWAYS

Source
Contracts Finder
Type
Contract (Works)
Duration
5 month
Value
£985K
Sector
TRANSPORT
Published
09 Jul 2024
Delivery
22 Jul 2024 to 20 Dec 2024
Deadline
17 May 2024 11:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

PJM/8 - Clifton Hall Tunnel, is situated in Swinton, Greater Manchester on the disused branch line that linked Patricroft with Molyneux Junction. The tunnel passes predominantly under residential housing and parkland aligned in a south-west to north-east direction. The double track tunnel, originally constructed in 1846, is 1187m long and lined with brick throughout. There are eight construction (blind) shafts along the length of the tunnel.

Award Detail

1 Amalgamated Construction (None)
  • Value: £985,110

CPV Codes

  • 50225000 - Railway-track maintenance services

Indicators

  • Contract is suitable for SMEs.

Reference

Domains