Rotunda Redevelopment

A Pre-Procurement Notice
by WESTBURY TOWN COUNCIL

Source
Contracts Finder
Type
Future Contract ()
Duration
not specified
Value
___
Sector
CONSTRUCTION
Published
11 Jul 2024
Delivery
not specified
Deadline
07 Sep 2024 22:59

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

A public realm project to remodel and refurbish the Rotunda seating area that sits at the head of the High St in Westbury town centre. This is intended to be the first public realm improvement in the wider strategy to regenerate Westbury Town centre - A Vision for Westbury. The works include the demolition of most of the existing brick walls above ground, taking care to preserve footings for the new stonework to be installed in its place. A lowering of levels will allow for greater access into the space and views to be opened up. A robust palette of materials is proposed to take the place of the deteriorated brickwork. The reuse of foundations and any aggregates and sub base materials is requested to reduce arisings from the site. Stone work is to be cut to measurements by the supplier away from site and delivered fully worked, and installed as per the drawings. The existing soft landscape is to be reduced and converted into a rain garden tree pit - retrofitted around the exiting trees rootzone. The methodology for this can be developed and agreed upon with the project landscape architect.

CPV Codes

  • 45111100 - Demolition work
  • 45111200 - Site preparation and clearance work
  • 45111213 - Site-clearance work
  • 45111240 - Ground-drainage work
  • 45111250 - Ground investigation work
  • 45111291 - Site-development work
  • 45112000 - Excavating and earthmoving work
  • 45210000 - Building construction work
  • 45220000 - Engineering works and construction works
  • 77310000 - Planting and maintenance services of green areas
  • 77330000 - Floral-display services

Other Information

for further information please contact Ben Griffiths info@westburytowncouncil.gov.uk RF-110-Westbury Rotunda Final Design Feb-23.jpg RF-110-Westbury Rotunda-Granite-brick-inside.jpeg WEST-CDY-XX-XX-SR-S-0100-P03 Retaining Wall Details.pdf WEST-CDY-XX-XX-DR-C-0020-P01 Construction details.pdf WEST-CDY-XX-XX-DR-C-0010-P02 Construction layout.pdf RF-110-SH-01 Planting Schedule.pdf RF-110-403 Granite Upstand Surround.pdf RF-110-402 Bench Detail.pdf RF-110-400 Site Sections.pdf RF-110-300 Hardworks Plan.pdf RF-110-200 Planting Plan.pdf RF-110-102 Existing Plan.pdf RF-110-100 Base Landscape Plan.pdf RF-110-003 SuDS General Arrangement Plan.pdf RF-110-002 Landscape General Arrangement Plan.pdf scope of works Rotunda scope of works.docx

Reference

Domains