Organic Rankine Cycle (ORC) System

A Tender Notice
by KBS MARITIME LTD

Source
Find a Tender
Type
Contract (Works)
Duration
23.5 month
Value
£4M
Sector
CONSTRUCTION
Published
13 Jan 2025
Delivery
To 07 Feb 2027 (est.)
Deadline
17 Feb 2025 15:00

Concepts

Location

Portsmouth

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

1. General Description Organic Rankine Cycle (ORC) system designed to generate electricity from low-temperature waste heat sources. Its should be capable of operating continuously or intermittently with a CHP engine. 2. Technical Specifications • Net Power Output: 200 – 400 kW per unit • Thermal Power Absorbed: 1000 – 4500 kW • Hot Water Temperature: Minimum 80°C • Working Media: Environmentally friendly, non-toxic, non-flammable • Control System: PLC system / MODBUS TCP

Total Quantity or Scope

• Net Power Output: 200 – 400 kW per unit • Thermal Power Absorbed: 1000 – 4500 kW • Hot Water Temperature: Minimum 80°C • Working Media: Environmentally friendly, non-toxic, non-flammable • Control System: PLC system / MODBUS TCP

CPV Codes

  • 45251000 - Construction works for power plants and heating plants
  • 45232141 - Heating works
  • 45251200 - Heating plant construction work
  • 65400000 - Other sources of energy supplies and distribution

Indicators

  • Variant bids may be considered.
  • This is a one-off contract (no recurrence)
  • Renewals are not available.
  • Professional qualifications are sought.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains