WC1565136 -(EP1175) -Tunnel Beach Mole (TBM) Dredging to enable exit and entry of the boats - WORKS

A Tender Notice
by MINISTRY OF DEFENCE

Source
Contracts Finder
Type
Contract (Works)
Duration
1.5 month
Value
£235K
Sector
CONSTRUCTION
Published
24 Jan 2025
Delivery
28 Mar 2025 to 09 May 2025
Deadline
31 Jan 2025 23:59

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

THE PROJECT CONCERNS THE DREDGING OF THE TUNNEL BEACH MOLE, WHICH IS LOCATED AT THE EPISKOPI GARRISSON AT THE SBAA AREA IN THE CYPRUS ISLAND. THE INNER BASIN AND OUTER AREAS OF THE MOLE ARE USUALLY PRONE TO SAND ACCUMULATION AND SEA WEEDS, WHICH PREVENT THE LAUNCHING OF BOATS FROM THE FACILITY. THE PROJECT REQUIRES THAT ALL SAND AND WEEDS ARE DREDGED TO THE REQUIRED DEPTHS AND SPOIL MATERIALS ARE RELOCATED ACCORDINGLY, AT THE EASTERLY COAST OF THE MOLE, AT THE AGREED LOCATION WITH THE DIO ENVIRONMENTAL OFFICER. HYDROCARBON TESTING PRIOR TO RELOCATION IS NECESSARY, WITH ALL UNSUITABLE MATERIAL REQUIRED TO BE DISPOSED AT LICENSED FACILITIES (I.E. CONTAMINATED SPOIL AND/OR SEA WEEDS AND/OR LARGE ROCKS). TYPICAL DREDGING DEPTHS REQUIRED ARE: - -1.5M AT THE INNER BASIN OF THE MOLE, AT LOW WATER TIDE LEVEL. - -2.0M AT THE OUTER AREA AND ENTRANCE OF THE MOLE, AT LOW WATER TIDE LEVEL. THE PROVISIONAL KEY TENDER DATES FOR THE PROJECT ARE AS FOLLOWS: - EXPRESSION OF INTEREST: FRIDAY 24TH JANUARY 2025 - EXPRESSION OF INTEREST RETURN: FRIDAY 31ST JANUARY 2025 - INVITATION TO TENDER: MONDAY 3RD FEBRUARY 2025 - TENDER RETURN DATE: FRIDAY 21ST FEBRUARY 2025 - CONTRACT AWARD: FRIDAY 28TH MARCH 2025 - COMMENCEMENT OF WORK: TUESDAY 1S APRIL 2025 - COMPLETION OF WORK: FRIDAY 9TH MAY 2025 THE CURRENCY OF THIS PROJECT IS EURO (€). THE EXACT PROJECT LOCATION CAN BE FOUND AT THE BELOW GOOGLE MAPS LOCATION, - GOOGLE MAPS LOCATION: HTTPS://MAPS.APP.GOO.GL/JDIETO9LLZFDPP5CA

CPV Codes

  • 45252124 - Dredging and pumping works

Indicators

  • Contract is suitable for SMEs.

Other Information

Please see the attached. 1. EOI (EXPRESSION OF INTEREST) FORM 2. PQQ (PRE-QUALIFICATION QUESTIONNAIRE) FORM BOTH FORMS MUST BE COMPLETED AND RETURNED BY THE INTERESTED TENDERERS. WORK COMMENCEMENT AND COMPLETION DATES WILL BE SUBJECT TO MOD DIO`S AGREEMENT OR REVISIONS DEPENDING ON GENERAL SITE OPERATIONAL REQUIREMENTS OR LIMITATIONS. 1. EOI (EXPRESSION OF INTEREST) FORM 2. PQQ (PRE-QUALIFICATION QUESTIONNAIRE) FORM BOTH FORMS MUST BE COMPLETED AND RETURNED BY THE INTERESTED TENDERERS. CSP - Expression of Interest Form - WC1565136.pdf 1. EOI (EXPRESSION OF INTEREST) FORM 2. PQQ (PRE-QUALIFICATION QUESTIONNAIRE) FORM BOTH FORMS MUST BE COMPLETED AND RETURNED BY THE INTERESTED TENDERERS. F39 PQQ - 24.05.24.pdf