HMP Bedford Fire Safety Improvements (RETENDER) - BPRN 508/16/1123

A Contract Award Notice
by MINISTRY OF JUSTICE

Source
Contracts Finder
Type
Contract (Works)
Duration
27 month
Value
£1M
Sector
CONSTRUCTION
Published
10 Feb 2025
Delivery
03 Feb 2025 to 12 May 2027
Deadline
12 Sep 2024 11:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

- Total replacement of the current Fire Safety systems within the built environment (ie site wide) , utilising hard wired system. - Furthermore, the integration of a number of sustainability initiatives including; replacement of LED lighting, introduction of lighting controls and water saving initiatives. A constructor has been appointed for the design and build of the project. This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract. The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology. The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £1,383,894. It is expected that the total construction cost of the project will be c£14m.

Award Detail

1 Kier Construction (None)
  • Value: £1,383,894

CPV Codes

  • 45216113 - Prison building construction work

Other Information

n/a 1123 - HMP Bedford - FSI - PPA - Kier - Signed_Redacted.pdf