Supply and Installation of LTHW Replacement Boiler and Flue System
A Contract Award Notice
by CENTRE FOR PROCESS INNOVATION LIMITED
- Source
- Contracts Finder
- Type
- Contract (Products)
- Duration
- 1 year
- Value
- £156K
- Sector
- INDUSTRIAL
- Published
- 25 Feb 2025
- Delivery
- 13 Feb 2025 to 12 Feb 2026
- Deadline
- 10 Jan 2025 12:00
Concepts
Location
Geochart for 1 buyers and 1 suppliers
1 buyer
1 supplier
- Nofi Engineering Solutions Doncaster
Description
CPI is a UK-based technology innovation centre which uses applied knowledge in science and engineering, combined with state-of the-art facilities to enable our clients to develop, prove, prototype and scale-up the next generation of products and processes. The National Formulation Centre Coxon building has a water heater boiler which is used to generate the Low Temperature hot water feed to the building to normal operating temperature of 80C. The current boiler set up is 3 stacked separate gas fired boilers which feed circulated hot water to the building heating system and the Air handling units from a common header. Water from the building is returned to the boilers for heating and recirculation.
Award Detail
1 | Nofi Engineering Solutions (Doncaster)
|
CPV Codes
- 45331110 - Boiler installation work
Indicators
- Contract is suitable for SMEs.
Reference
- 3469
- CF cd1fe163-8685-4de7-b5f3-d1a9cbf46d59