Supply and Installation of LTHW Replacement Boiler and Flue System

A Contract Award Notice
by CENTRE FOR PROCESS INNOVATION LIMITED

Source
Contracts Finder
Type
Contract (Products)
Duration
1 year
Value
£156K
Sector
INDUSTRIAL
Published
25 Feb 2025
Delivery
13 Feb 2025 to 12 Feb 2026
Deadline
10 Jan 2025 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

Description

CPI is a UK-based technology innovation centre which uses applied knowledge in science and engineering, combined with state-of the-art facilities to enable our clients to develop, prove, prototype and scale-up the next generation of products and processes. The National Formulation Centre Coxon building has a water heater boiler which is used to generate the Low Temperature hot water feed to the building to normal operating temperature of 80C. The current boiler set up is 3 stacked separate gas fired boilers which feed circulated hot water to the building heating system and the Air handling units from a common header. Water from the building is returned to the boilers for heating and recirculation.

Award Detail

1 Nofi Engineering Solutions (Doncaster)
  • Value: £155,523

CPV Codes

  • 45331110 - Boiler installation work

Indicators

  • Contract is suitable for SMEs.