CWF Lot 2A - Reconstruction of Scrithwaite Wood Retaining Wall

A Contract Award Notice
by WESTMORLAND AND FURNESS COUNCIL

Source
Contracts Finder
Type
Framework (Works)
Duration
25 day
Value
£75K
Sector
CONSTRUCTION
Published
31 Mar 2025
Delivery
28 Apr 2025 to 23 May 2025
Deadline
06 Mar 2025 12:30

Concepts

Location

Geochart for 1 buyers and 1 suppliers

Description

his project is for the design and reconstruction of approximately 15m length of Scrithwaite Wood Retaining Wall on the C5008, North of Broughton Mills. The existing wall has partially collapsed, with an adjacent length being in an unstable condition. The wall retains approximately 2.1m (max) of land (public highway) above a steep inclined slope. The collapsed section of the wall has created a residual slope of consolidated material with a 1m vertical slope of exposed natural gravel material below the defined road construction. The Contractor will be required to undertake the role of Principal Designer & Principal Contractor and fulfil their obligations in accordance with CDM 2015. The Contractor will be required to design and construct the permanent engineered highway retaining wall. The Contractor will be required to design and check temporary works as required e.g. provision of shoring for excavation. The Contractor should consider the design period required for the temporary and permanent works, including Technical Approval to CG300 and Design & Check Certification - considered to be a Category 0 structure.

Award Detail

1 Metcalfe Plant Hire (Cumbria)
  • Value: £116,868

CPV Codes

  • 45000000 - Construction work

Reference

Domains