Replacement of the Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface

A Tender Notice
by THE UNIVERSITY OF BIRMINGHAM

Source
Find a Tender
Type
Contract (Services)
Duration
4 month
Value
£260K
Sector
INDUSTRIAL
Published
03 Apr 2025
Delivery
01 Jun 2025 to 30 Sep 2025
Deadline
28 Apr 2025 12:00

Concepts

Location

Birmingham:

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The University of Birmingham invites tenders for the Replacement of Waste Heat Recovery Boiler Panel with Integrated Duct Burner and Gas Turbine Interface. The current Waste Heat Boiler panel was built in 1990/91 and controls the operation of a water tube boiler that utilizes the exhaust from a Solar Mercury 50 gas turbine. The exhaust heat enables the university to generate 3500Kg/hr of saturated steam @ 17barG although the boiler is rated at 25barG. There is a supplementary burner within the boiler that can fire from 0.2barG natural gas to 3.5barG which allows the flexibility of the boiler range between 3500Kg to 18000Kg an hour, therefore providing a base load during the winter months. Please refer to Appendix A and associated appendices for the full specification of requirments available via www.intendhost.com/universityofbirmingham The works are to be completed by September 2025. Site visits are essential. These will be arranged via the correspondence feature on the InTend e-procurement portal.

Award Criteria

Simple description Tender submissions will be evaluated against the award criteria published within the tender documents and uploaded to the e-procurement portal: Procurement Specific Questionnaire: 10% Compliance to Specification: 15% Technical Skills and Ability: 10% Quality: 15% Price: 50%

CPV Codes

  • 51130000 - Installation services of steam generators, turbines, compressors and burners

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains