Supply of Cab HVAC Overhaul Services for the 09TS Victoria Line Fleet
A Utilities Contract Award Notice
by TRANSPORT FOR LONDON
- Source
- Find a Tender
- Type
- Contract (Supply)
- Duration
- not specified
- Value
- £921K
- Sector
- TRANSPORT
- Published
- 16 Apr 2025
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
London
Geochart for 2 buyers and 1 suppliers
2 buyers
- Transport for London London
1 supplier
- Tidyco Derby
Description
Supply of Cab HVAC Overhaul Services for the 09TS Victoria Line Fleet - There are 47 trains with 8 cars on the Victoria line (09TS). Each train has two cabs, one at each end. Each 09TS cab has two HVAC modules installed on the underframe on the left and right-hand side (non-driver's side and driver's side respectively, The purpose of the cab HVAC modules is to supply fresh air to the cab and maintain the thermal comfort of those in the cab, principally the train operator.
Award Detail
1 | Tidyco (Derby)
|
Renewal Options
Option to extend contract by 2 Years
CPV Codes
- 34600000 - Railway and tramway locomotives and rolling stock and associated parts
Indicators
- Options are available.
Reference
- FTS 015561-2025