3rd Line Support for the Maintenance of the London Overground WestCAD & SSI Interlocking

A Contract Award Notice
by TRANSPORT FOR LONDON

Source
Find a Tender
Type
Contract ()
Duration
not specified
Value
£135K
Sector
MISCELLANEOUS
Published
24 Apr 2025
Delivery
not specified
Deadline
n/a

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

This is a single source for the Third line support and maintenance contract for the WestCAD signalling control and display system (SCDS) and the Solid-State Interlocking (SSI) which were developed by and installed by Siemens Mobility Limited for signalling control on the London Overground Core Windrush Line (formerly East London Line). The contract will end on the 31st July 2026. This contract undertakes 3rd line support should faults not be rectified locally across the line. Siemens provide a 24/7 diagnostic hotline, all operational spares, escalation of fault to expert if unable to resolve and the availability of system experts in hardware/software. This is estimated to cost during this period is £135,000 (excluding VAT).

Award Detail

1 Siemens Mobility (London)
  • Third line Support by Siemens Mobility Limited for the Maintenance of the London Overground WestCAD & SSI Interlocking
  • Reference: 1
  • Value: £135,000

CPV Codes

  • None found

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains