Design and Build Bow Door Lifting Replacement for Landing Craft Tank- LCT 7074

A Tender Notice
by NATIONAL MUSEUM OF THE ROYAL NAVY

Source
Find a Tender
Type
Contract (Works)
Duration
7 month
Value
£30K
Sector
CONSTRUCTION
Published
27 May 2025
Delivery
14 Jul 2025 to 13 Feb 2026
Deadline
20 Jun 2025 11:00

Concepts

Location

United Kingdom:

Geochart for 1 buyers and 0 suppliers

Description

The National Museum of the Royal Navy (NMRN) are seeking to appoint a contractor to design, build and install replacement bow door lifting arrangements onto Landing Craft Tank- LCT 7074 situated at the D-Day Story, Southsea, UK. LCT 7074 is owned as part of the NMRN Historic Ships fleet, it is operated by the D-Day Story as a visitor attraction. The replacement bow door lifting arrangements is to ensure the continued operation of the landing craft all year and to reduce the current maintenance cost of the current installed arrangement. The intention is for works to be undertaken during the off-peak season between November 2024- March 2026. With requirement for Heritage Impact Assessment to be undertaken and approved by NMRN and associated stakeholders before fabrication and installation is made. Site visits are strongly advised for this tender to see the current arrangement, and also to survey the landing crafts port and starboard arms where lifting arrangements are to be installed.

CPV Codes

  • 45220000 - Engineering works and construction works

Indicators

  • Participation is restricted sheltered workshops.

Other Information

There are additional documentation including photographs and drawings to interested bidders- expression of interest must be sent to tenders@nmrn.org.uk to receive this. ** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains