ISO 11 Incinerator Life Extension: WP2 Control Panel Control HAZOP items to reduce operational risk to
A Contract Award Notice
by THE PIRBRIGHT INSTITUTE
- Source
- Find a Tender
- Type
- Contract ()
- Duration
- not specified
- Value
- ___
- Sector
- MISCELLANEOUS
- Published
- 17 Jun 2025
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Geochart for 1 buyers and 1 suppliers
1 buyer
- Pirbright Institute Woking
1 supplier
- Lührfilter Burntwood
Description
The ISO 11 Incinerator was installed within the "Postmortem - Incinerator" (PMINCIN) building circa 1994/95 and much of the original plant remaining has now reached the end of its lifecycle. Following a period of unreliability throughout 2021, and the outcome of a Hazard and Operability (HAZOP) study during April 2022, the ISO 11 10-year life extension project was initiated, which has been approximately 50% delivered to date. Work Package 2: Control Panel replacement is currently in the design phase and a detailed design has been produced and the required Control HAZOP (CHAZOP study) completed for the proposed design.
Award Detail
1 | Lührfilter (Burntwood)
|
CPV Codes
- None found
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-054e02
- FTS 032847-2025