ISO 11 Incinerator Life Extension: WP2 Control Panel Control HAZOP items to reduce operational risk to

A Contract Award Notice
by THE PIRBRIGHT INSTITUTE

Source
Find a Tender
Type
Contract ()
Duration
not specified
Value
___
Sector
MISCELLANEOUS
Published
17 Jun 2025
Delivery
not specified
Deadline
n/a

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

The ISO 11 Incinerator was installed within the "Postmortem - Incinerator" (PMINCIN) building circa 1994/95 and much of the original plant remaining has now reached the end of its lifecycle. Following a period of unreliability throughout 2021, and the outcome of a Hazard and Operability (HAZOP) study during April 2022, the ISO 11 10-year life extension project was initiated, which has been approximately 50% delivered to date. Work Package 2: Control Panel replacement is currently in the design phase and a detailed design has been produced and the required Control HAZOP (CHAZOP study) completed for the proposed design.

Award Detail

1 Lührfilter (Burntwood)
  • Reference: 1

CPV Codes

  • None found

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains