CWF Lot 2A - Southwaite (Petteril) Bridge - Arch Barrel Repairs
A Contract Award Notice
by WESTMORLAND AND FURNESS COUNCIL
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 3.5 month
- Value
- £30K
- Sector
- CONSTRUCTION
- Published
- 26 Jun 2025
- Delivery
- 16 Jun 2025 to 30 Sep 2025
- Deadline
- 29 May 2025 11:00
Concepts
Location
Geochart for 1 buyers and 1 suppliers
1 buyer
1 supplier
- Metcalfe Plant Hire Penrith
Description
Southwaite (Petteril) Bridge is located on the C3010 and is a 2 span masonry arch structure that provides access over the River Petteril, a Main River. The structure was widened on the upstream side on the 1840's and the older, downstream section was saddled in 1990. The contract will be to undertake masonry repairs on the older section of the eastern arch. The arch barrel has suffered from deep mortar loss and voiding over approx. 50% of the barrel and will require repairing via pressure grouting or another suitable method. There are also 2 areas of spall on either end of the arch that will require suitable repairs.
Award Detail
1 | Metcalfe Plant Hire (Penrith)
|
CPV Codes
- 45000000 - Construction work
Indicators
- Contract is suitable for SMEs.
Reference
- WAFC001-DN771473-16772142
- CF 54f81bff-8cae-44a9-9963-b4cb225077dc