Ground Investigations for Lot 1 - CMAL SVRP Enabling Works Lot 2 Gasay Ferry Terminal Redevelopment

A Contract Award Notice
by CALEDONIAN MARITIME ASSETS LTD (UTILITY)

Source
Find a Tender
Type
Contract (Works)
Duration
0.5 year (est.)
Value
£1M
Sector
CONSTRUCTION
Published
31 Jul 2025
Delivery
To 27 Jan 2026 (est.)
Deadline
n/a

Concepts

Location

Port Glasgow

Geochart for 2 buyers and 2 suppliers

2 buyers

1 supplier

Description

CMAL wish to appoint a sole supplier in respect of marine survey and marine and land-based ground investigations for the Small Vessel Replacement Programme (SVRP) Enabling Works and Gasay Ferry Terminal Redevelopment.

Lot Division

1 CMAL SVRP Enabling Works

CMAL propose to upgrade 8 ports in the West of Scotland to accommodate electrically powered pedestrian/vehicle ferries. Short roll-on roll-off (ro-ro) crossings between mainland and Islands operate between these ports, using relatively small vessels, which require associated infrastructure. Ground investigations are required at 5 of the ports in order to characterise the ground conditions for dredging design at two locations, and for foundation design for new aligning structures at three other locations. New sub-stations and cabling works will be required at all sites. The purpose of the main works is to undertake a marine survey and marine and land ground investigations to develop a replacement berth and ferry terminal. The purpose of this lot is to gather information that will allow for development of an outline design as well as a detailed design of the main works proposed. This information will be gathered through marine and land Ground Investigations (GI) within the study area, which will be targeted to address the geotechnical and geo-environmental constraints, along with their potential impact on the works proposed.

2 Ground Investigations for Lot 2 - Gasay Ferry Terminal Redevelopment

The purpose of the main works is to undertake a marine survey and marine and land ground investigations to develop a replacement berth and ferry terminal. The purpose of this lot is to gather information that will allow for development of an outline design as well as a detailed design of the main works proposed. This information will be gathered through marine and land Ground Investigations (GI) within the study area, which will be targeted to address the geotechnical and geo-environmental constraints, along with their potential impact on the works proposed.

Award Detail

1 Causeway Geotech (Ballymoney)
  • CMAL SVRP Enabling Works
  • Num offers: 5
  • Value: £337,779
  • Contractor is an SME.
2 Causeway Geotech (Ballymoney)
  • Ground Investigations for Lot 2 - Gasay Ferry Terminal Redevelopment
  • Num offers: 5
  • Value: £682,804
  • Contractor is an SME.

Award Criteria

Quality 40.0
PRICE 60.0

CPV Codes

  • 45100000 - Site preparation work

Indicators

  • Award on basis of price.

Other Information

(SC Ref:805965)

Reference

Domains