FEC 2996796 FE (Further Education) Colleges Sector Framework for Planned Preventative Maintenance, Response Maintenance and minor works
A Modification Notice
by CPD - CONSTRUCTION DIVISION
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 4 year
- Value
- £817K-£34M
- Sector
- CONSTRUCTION
- Published
- 12 Aug 2025
- Delivery
- To 12 Aug 2029 (est.)
- Deadline
- n/a
Concepts
Location
Lot1 Belfast Metropolitan College, Lot 2 Northern Regional College, Lot 3 North West Regional College, Lot 4 South Easter Regional College, Lot 5 Southern Regional College, Lot 6 South West College
2 buyers
- CPD Construction Division Belfast
4 suppliers
- Irwin ME Craigavon
- Graham Asset Management Hillsborough
- LM Services NI Belfast
- HJ Martin Belfast
Description
The Framework Agreement is for the provision of a wide range of construction related property maintenance services for the 6 NI Regional Colleges (Belfast Metropolitan College – BMC; Northern Regional College – NRC; North West Regional College – NWRC; South Eastern Regional College –SERC; Southern Regional College – SRC; and South West College – SWC) as follows: Planned Preventative Maintenance (PPM) - the regular routine inspection, testing and servicing of plant and equipment. Response Maintenance / Minor Works – for individual Task Orders for repairs or maintenance to buildings, equipment, and mechanical and electrical systems. Response Maintenance is a 365 day / 24 hour service. Minor Works projects – the provision of building, mechanical, electrical, and / or specialist construction works projects to meet specific client requirements. All works are undertaken in compliance with all relevant statutory, regulatory, and other authoritative requirements.
Ammendments to Previous Notice
2. Contract value
GBP 28,751,874 34,112,290
Award Detail
1 | Irwin ME (Craigavon)
|
2 | Graham Asset Management (Hillsborough)
|
3 | Irwin ME (Craigavon)
|
4 | LM Services NI (Belfast)
|
5 | HJ Martin (Belfast)
|
CPV Codes
- 45453100 - Refurbishment work
- 45214300 - Construction work for college buildings
- 45431000 - Tiling work
- 45331000 - Heating, ventilation and air-conditioning installation work
- 45351000 - Mechanical engineering installation works
Indicators
- Contract modified due to additional needs.
Legal Justification
The modification is justified under Regulation 72(1)(e) of the Public Contracts Regulations 2015, as the changes are not substantial within the meaning of Regulation 72(8). The modification does not render the Framework[s] materially different in character, does not introduce new conditions that would have allowed for the admission of other candidates or attracted additional participants, does not change the economic balance in favour of the contractors, does not considerably extend the scope, and does not involve a change of contractor. The modification is strictly limited to the value necessary to ensure continuity of essential services while a new procurement process is completed. The Colleges have a statutory obligation to maintain these services and cannot permit a gap in provision.
Other Information
CPD in its capacity as a Central Purchasing Body, is administering this procurement on behalf of the Contracting Authority. The. Contracting Authority expressly reserves the right: . i. to award one, some, all or no Lots;. ii. not to award any contract/framework. agreement as a result of the procurement process commenced by publication of this notice or to cancel the procurement at any stage; and. iii. To make whatever changes it may see fit to the content and structure of the tendering competition. Andin no circumstances. will the Authority be liable for any costs incurred by Economic Operators or Candidates. Any expenditure, work or effort undertaken prior. to the contract award is accordingly at the sole risk of the Economic Operator or Candidate participating in this procurement process. This project will be used to process the Government’s wider social, economic and environmental objectives. No business whatsoever. is guaranteed under any resulting contract or framework agreement, indeed there is no guarantee that any contract or framework. agreement will be put in place in relation to this notice... No compensation, etc, will be paid if a contract or framework agreement is. withdrawn for any reason. Economic Operators should take part in this process only on the basis that they fully understand and accept. this position
Reference
- FTS 047966-2025