CO Construction - Initial Works (Part A) ASTI Onshore 400kv Substation - LT444 Longside 400kV Substation and LT474 Longside 132kV Substation- 1225
A Utilities Contract Award Notice
by SSE PLC
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 4 year (est.)
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 20 Aug 2025
- Delivery
- To 20 Aug 2029 (est.)
- Deadline
- n/a
Concepts
Location
Perth
Geochart for 2 buyers and 1 suppliers
Description
The initial design, engineering and preconstruction associated with the Longside 400kV and 132kV Substations
Total Quantity or Scope
SSENT submitted a plan to Ofgem for the delivery of the required strategic investment in the transmission network, essential to accelerate the transition towards a low carbon energy system and to deliver 50GW of offshore wind by 2030. The need was approved by Ofgem in Q4 2022. These design works are part of this portfolio.
Award Detail
1 | Unnamed (None) |
CPV Codes
- 45232220 - Substation construction work
Indicators
Reference
- FTS 050017-2025