Culvert Flow Gauging Structure - Ceredigion

A Prior Information Notice
by MINING REMEDIATION AUTHORITY

Source
Find a Tender
Type
Contract (Services)
Duration
4 month
Value
___
Sector
CONSTRUCTION
Published
26 Aug 2025
Delivery
01 Dec 2025 to 31 Mar 2026
Deadline
20 Oct 2025 22:59

Concepts

Location

West Wales and the Valleys:

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The Mining Remediation Authority (MRA) is seeking a contractor to construct a flow monitoring structure at the outfall of a historic culvert. This culvert drains the dressing floor of a former mine site. The purpose of the structure is to enable accurate measurement of water flows entering a recently lined stream. Following the application of concrete canvas to line the stream, water discharging from the culvert is no longer contained within the channel. This is due to the culvert's invert level being lower than the level of the stream lining at the discharge point, causing water to flow beneath the lined channel. As a result, sediment has accumulated near the culvert outlet. The proposed works involve modifying the existing stone-lined culvert to intercept and convey flow to a suitable downstream location. At this point, a V-notch weir will be installed to discharge into the lined stream, allowing for accurate flow measurement. Due to the risk of sediment build-up within the culvert, a CCTV survey will be required to assess sediment volume. If necessary, sediment will be removed to prevent future obstruction of the monitoring structure.

Renewal Options

If weather conditions hamper the delivery of works

CPV Codes

  • 71300000 - Engineering services

Indicators

  • Renewals are available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

Domains